Monthly Archives: February 2012

DSC04983

Ready to roll?

Posted by & filed under work.

This was a big moment. We have started to assemble the suspension. Insert the polyurathane bushes, secure the lower and upper ball joints, fix the uprights, insert the coilovers and the front left suspension is ready. After repeated on the other side and at the back, Luc was almost ready to be put on wheels. […]

DSC04934

Roll bar, floor, suspension

Posted by & filed under work.

During the christmas holiday I did work in the garage alone. There was a plenty of things to do and since it was possible to make them alone, Ladislav’s presence was not required. One of the things that were done was the roll bar. A local friend with a bending maschine helped with this one. […]